a.
Quantitative Analysis |
|
|
|
Existing Building Gross Square Footage
40,168
sf |
|
Basement |
|
|
West
Building (below stage) |
2,400 sf |
|
|
First Floor |
|
|
(Main Theater)
West Building
|
12,250sf
|
total |
|
East Building |
12,250sf |
total |
|
Lobby/Concessions/Toilets |
6,125sf |
|
|
First Street Retail |
1,050sf |
|
|
Black Box/Kitchen |
5,075sf |
|
|
Second Floor |
|
|
(Balcony)
West
Building
|
2,000sf |
|
| |
East Building
|
6,900sf |
|
b.
Structural System
The structure is a traditional masonry exterior load bearing
walls with steel columns supporting steel roof trusses in both
the west and east buildings. The first floor is a concrete
slab on grade. This includes the lobby area, concession,
and sloped floor of the auditorium. Currently, no floor
exists (dirt) in the area proposed as the black box. An
extensive amount of steel was added that includes the west
building balcony, stage, theatrical rigging positions, and
second floor of east building. Metal deck has been
installed at the balcony and second floor of east building with
no concrete topping. No major structural concerns were
observed.
c.
Architectural System
Architecturally the building is
significant as a hybrid example of the neighborhood theater and
the movie palace, constructed near the end of the Great
Depression and before World War II. Theaters built after WWII
were often of the multi-plex format with little architectural
embellishment. In many ways Wyandotte's theater may be viewed as
an early experiment, and forerunner of this national trend.
Yellow brick with red brick linear accents covers the south
faηade exterior. A corner marquee and curved corner box office
has blue tile around the entrance. The original glazed
metal panels exist and are covered by plaster like material. In
the late 1990s nearly $500,000 of structural steel was added to
the interior, and progress made towards completing the 1,000
seat auditorium and adjacent black box space. Improvements were
also proposed for the lobbies, areas for refreshment, patron
boxes, and extensive office space on the second floor.
Reconstruction work was stopped on the project four years ago.
During that time no activity has occurred.
Three significant conditions of concern were observed during the
walk thru that exists in the facility.
Roof mold is visible on the
underside of the roof deck that appears to be gypsum plank or
gypsum panels. Further investigation will be required to
determine the roof decks integrity. Various areas of the
roofing system appear to have been compromised, allowing water
infiltration.
Foundations Water is
penetrating the foundations at the pit that was created to
accommodate the pit lift. JS Vig indicated that a solution
to resolve the problem had been determined just prior to the
stop of construction. Further investigation will be required.
Environmental Bird droppings exist within the facility and
will require remediation. Additionally, as indicated
above, mold exists on the underside of the roof deck in various
parts of the facility. The largest concentration appears
in the main theater at the back of house.
d.
Mechanical, Electrical, and Plumbing Systems
The facility is unheated with no apparent air handling systems
installed and has no electric service. Rough plumbing has
been installed below the floor slabs at the first floor
restrooms.
e.
Plan / Program Review
This is a cursory review and should not be considered inclusive.
None of these issues should prohibit continuation of the project
nor add significant costs beyond what is already proposed.
They include the following:
Loading
dock:
Direct load in no staging area
Shared door for load-in and load-out
Stage area lost due too folding ramp
Backstage door to small recommend 10- 12 high,
additionally, one in / one out
Inside and
outside noise:
No sound lock at load-in door and west exit of auditorium
Principal entry to black box
East exit from auditorium to concession area
Further evaluation of roof system
outside noise from rain,
airplanes, cars, etc.
Theatrical
Lighting positions:
No follow spot locations
No forestage lighting position
No side lighting positions (usually @ proscenium and 45`)
Storage:
Very little storage
Large area required for Black Box
Property storage room
No place to store acoustic shell
Concessions:
Counter appears to be about 14
long
recommend minimum 21 long
assumes 3 to 4 servers at 6 each
to serve capacity)
ADA
(American Disabilities Act):
Barrier free dressing room required at stage level
Barrier free access to orchestra pit
Control
Room:
Proposed size is appears acceptable
No location for follow spot or film
projection
(could use TV projection)
Stage Power:
1,000 to 2,500 amp recommended
Patron First
Aid Room:
No location indicated
Sight Lines:
Movie sight lines different then performance
Balcony appears bad unless
staggered
additional evaluation required
Box Office:
Appears line-up could block access
to black box unless
door is for exit only
Stage Size:
Appears satisfactory 30x70 recommended minimum
Gift Shop:
No location indicated
Restroom
Capacity:
Recommended 1 toilet per 20 seats
23 for women and 12 for men
Provided 9 for women and 10 for men
General
Observations:
Two exits required from basement
and orchestra pit,
and second floor dressing rooms
unless through office area
Intent of barrier free seating not serviced
Dressing rooms seemed under sized
-
Too many showers and sinks
-
No flexibility
-
No star dressing room
No space for musicians to warm up
No space to store geni-lift
Black box tech booth too small
Green room too small
Location of dimmer and amplifier
room?
Only one actor entry point to black
box
unless you enter thru auditorium
Laundry room (remote location in basement)
Stagehands locker rooms / tech office / tech repair
Action Steps
-
Review design/construction issues
with consultants,
architects and contractors
-
Seek additional expertise, as
required,
in both theatre design and
acoustics
-
Develop new designs as necessary
and feasible;
revise cost estimates based on new
designs
and existing construction
-
Determine funding needs and means
IV.
Cost Analysis and Redevelopment Incentives
a.
Cost Estimate Analysis Considerations
The following major accounts will be considered in subsequent
stages in the comprehensive analysis of the theater
rehabilitation:
1. Site
Development
Includes all work required which lies within the contract limit
line and five feet from the edge of the building, i.e., grading
and fill, fencing. Roads and parking, utilities, landscape
development, walks, site lighting, street furniture and site
graphics.
2. Building
Construction
All normal costs of building construction, restoration and
renovation; within five feet of the building line; items
required by code (fire extinguishers, cabinets, fire alarm
systems, etc.)
3. Fixed
Equipment
Includes fixed equipment such as storage lockers, security
equipment and food service equipment.
4. Site
Acquisition / Demolition
Money budgeted for purchasing the project site and/or demolition
of existing structures.
5. Movable
Equipment
Includes all normal moveable furnishings such as window
coverings, lamps, furniture, and equipment but does not include
operational equipment.
6. Professional
Fees
Cost for basic architectural and engineering services.
7. Contingency
A percentage of the total construction cost to serve as design
contingency, bidding contingency and construction reserve to
cover discovery issues, i.e., field and change orders, etc.
8. Administrative
Costs
An allowance for items for which the owner is responsible for
during the planning and construction process, i.e., legal fees,
insurance, testing materials, site survey, reimbursables,
additional services, and special consultants.
b.
Potential Applicable Redevelopment Incentives
1.
Michigan Obsolete
Property Rehabilitation Certificate (Act 146)
Exemption of ad valorem taxes on
rehabilitation value and
new construction project expansion
for up to 12 years
Applies to buildings only
New construction eligible only in
combination with
rehabilitation work
2.
Federal Preservation
Tax Credit
20% for Historic Rehab, or 10% for pre-1936 structure rehab
Requires private entity own and rehabilitate structure
3.
Federal Section 170(h)
Conservation Easement
Dedication of Theater building facade
to IRS 501(c)(1)/(3) entity
Enables taking of tax liability deduction
4.
Michigan Brownfield
Redevelopment Single Business Tax Credit
10% of redevelopment value
(demolition, rehab, new construction).
5.
Michigan Brownfield
Redevelopment Tax Increment Financing (TIF)
Reimbursement of approved eligible activities
Amortized over period with interest on outstanding balance
Infrastructure is eligible as Wyandotte is a designated
local unit
V.
Conclusion
It was the general consensus of the
industry professionals that the preliminary conditions
assessment of the facility provided adequate information to
conclude the building is sound and can support the completion of
the restoration. The areas of concern outlined within this
summary may have cost implications, but little ramifications on
the stability of the structure. The next step of our
chronological series of checkpoints that must result in a
positive outcome before proceeding are as follows:
Action Steps
Assemble Conceptual Operating Plan to define range of
opportunities we intend to explore. Identify what
operating uses may work, how they would be supportive of the
community interest and how they would be conducted.
Define how control of the site will be obtained. Negotiate
with current stakeholders and establish what they would require
to transfer control. If we can secure an adequate option
with appropriate terms, we will then identify what funding
sources can be solicited to achieve this objective.
Solicit viable operators to submit proposed plans and select an
operator to work with the City of Wyandotte that will yield the
best outcomes for the community.
Prepare rehabilitation plans and define what funds are needed.
Prepare funding solicitations to identified sources and submit.
Once adequate funding sources have been secured, arrange for
rehabilitation team to complete the project.
VI. Appendix
a.
Reconstruction
Drawings (Gensler Associates, 1999)
i.
Floor Plans
ii.
Exterior Elevations
b.
Existing Photographs
i.
Interior
ii.
Exterior
c.
Historic Photograph
d.
Edward Francis, FAIA,
Gunn Levine Associates
i. Resume
ii. Project
Experience